ADR-001

Schema changes go through journaled, expand/contract migrations

Context

The schema in server/database/schema.ts and the production database have drifted apart, and three different mechanisms change production:

  • The drizzle journal stops at 0017. server/database/migrations/meta/_journal.json has 18 entries (0000–0017). 0018_catch_up_and_report_dedupe.sql and its snapshot exist but are not journaled; there is no 0019; there are two 0020 files (0020_early_bird_columns.sql, 0020_opt_in_attendees.sql); 0021–0024 are hand-written, idempotent SQL applied by hand (0023_profile_languages.sql:1-3 says so explicitly).
  • 0018 cannot be applied to production. It runs CREATE TABLE "events" (0018_catch_up_and_report_dedupe.sql:31) without IF NOT EXISTS, but events was created out of band by scripts/migrate/00-schema.mjs:8 on 2026-07-15.
  • Out-of-band DDL lives in scripts. scripts/migrate/00-schema.mjs adds dancers.source_ref (line 5) and a follows table (line 32) that are not in schema.ts. scripts/sync-v3-events.ts:65 applies migration files at runtime.
  • That coupling just broke production. PR #202 (commit 4728250) deleted 0021_events_v3_sync.sql and 0022_v3_profile_sync.sql while folding them into 0018. sync-v3-events.ts:65 still reads them, so the daily wedance.vip sync has failed with ENOENT on 2026-10-10, 10-11 and 10-12 (~/.config/wedance/v3-sync.log): no new or updated v3 events for three days (stories RAZ-251, RAZ-162, RAZ-28).
  • The app tolerates missing columns at runtime. server/trpc/routers/events.ts:36-54 catches Postgres 42703 ("column does not exist") and retries without artists; plan.ts:51-52 avoids selecting metadata "so the query works even if migration 0023 hasn't been applied yet". Code that has to guess the schema is a symptom.
  • schema.ts declares a table production does not have. cities (schema.ts:739) is not in production yet (docs/research/2026-10-12-city-canonicalisation.md:18).
  • db:push is a loaded gun. package.json:20 maps db:push to drizzle-kit push. Pushed at production, it diffs against schema.ts and proposes dropping follows (667 migrated edges, CLAUDE.md "Data") and dancers.source_ref (the rollback key for 3,910 migrated users).
  • Previews write to production. CLAUDE.md:131-134: Vercel preview deployments share the production DATABASE_URL. Every PR's unreviewed code can write to production rows, including real dancers and Stripe test payments.

Options

  1. Keep hand-applied SQL and document the order. Cheapest today; it is what produced every problem above.
  2. drizzle-kit push everywhere. Fast for prototypes; no review artefact, no rollback, destructive diffs on drift (see above). Not acceptable with live data.
  3. Journaled drizzle-kit generate + drizzle-kit migrate, one baseline, expand/contract for every breaking change, and a separate Neon branch per preview.

Decision

Option 3.

  • Baseline once (migration step 0). Introspect production (drizzle-kit introspect against a Neon branch of prod), reconcile schema.ts with it (add dancers.source_ref and the legacy follows table to schema.ts so nothing proposes dropping them; keep cities as the first real migration), then replace the folder with a single journaled 0000_baseline.sql and mark it applied in production's drizzle.__drizzle_migrations without executing it. The old files move to server/database/migrations/_archive/ for history.
  • One path to production: drizzle-kit generate → review the SQL in the PR → drizzle-kit migrate from CI on merge, before the deploy is promoted. db:push is removed from package.json; local work uses a throwaway Docker database.
  • Runtime code never runs DDL. scripts/sync-v3-events.ts checks that the schema it needs exists and exits with a clear error otherwise; it does not apply migration files. The 42703 fallbacks in events.ts and the metadata caveat in plan.ts are removed once the baseline is in.
  • Expand → backfill → switch reads → contract. Every change that removes, renames or tightens something ships as at least two migrations in two deploys: additive first (new columns/tables nullable or defaulted, dual-write in code), a re-runnable backfill (batched, WHERE new_col IS NULL), a deploy that reads the new shape, and only then a contract migration that drops the old shape. A contract step needs the Commander's explicit approval and a Neon PITR restore point taken immediately before it.
  • Constraints land NOT VALID first. New foreign keys and check constraints are added NOT VALID (no table scan, no long lock) and VALIDATEd in a later migration after the backfill; new indexes on large tables use CREATE INDEX CONCURRENTLY (drizzle-kit emits plain CREATE INDEX, so those statements are hand-edited and the migration is marked non-transactional).
  • Previews get their own database. Each Vercel preview uses a Neon branch created from production (Neon's Vercel integration does this per deploy), so a PR can read realistic data and write without touching production.

Rendering diagram…

Diagram source
flowchart LR
  A[Edit schema.ts] --> B[drizzle-kit generate]
  B --> C[PR: review SQL + code]
  C --> D[Preview on a Neon branch]
  D --> E[Merge]
  E --> F[CI: drizzle-kit migrate on prod]
  F --> G[Promote deploy]

Consequences

  • Schema drift becomes visible in review instead of in production.
  • Breaking changes cost two deploys. That is the price of a live database.
  • The sync script stops being a migration runner; the v3 sync outage cannot recur this way.
  • Neon branches per preview cost storage; branches are deleted when the PR closes.

Stories unblocked

None directly — every other migration step depends on this one. It restores RAZ-251, RAZ-253 and RAZ-162 (the v3 sync) once the sync no longer reads deleted migration files.